Energy · Turbine · Marine · Electrical

POWER
IN
MOTION.

A cinematic industrial platform for NEGBUY — connecting critical equipment, energy systems and technology across demanding industries.

Scroll / Explore
Energy SystemsPower generation and clean energy solutions.
Turbine SolutionsGas turbine parts, engines and industrial equipment.
AutomationElectrical control and industrial automation.
01.2 / Manufacturing

FROM STEEL
TO SPIN.

A single, continuous build line. Scroll to walk the shop floor: casings are machined, modules are stacked to drawing, the rotor is balanced, and every unit is proven at full speed before it ships.

ISO 9001APIASMEEst. 2016
01Machining cell

Casing & Rotor Machining

Real gas turbine casing on the factory assembly floor
NB-4180 · REV C · 1:20

Casing halves go on 5-axis centres and the rotor discs are finish-turned to drawing. Every bore, face and rabbet is measured against the build sheet before the part leaves the cell.

Machines
5-axis CNC
Tolerance
±0.01 mm
Traceability
Full, per part
±0.01mm tolerance
02Compressor build

Compressor Module

Real axial compressor blades and vanes
NB-4230 · REV B · 1:25

Rotor blade rows and variable stator vanes are stacked and set to axial clearance. This is where up to 800 kg/s of air begins its rise toward an 18:1 pressure ratio.

Stages
16 axial
Blade alloy
Ti / Ni
Clearance
0.4–0.7 mm
18:1pressure ratio
03Combustion build

Combustion Module

Real Siemens Energy SGT5-8000H gas turbine cutaway
NB-4290 · REV D · 1:20

Fuel nozzles and the thermal-barrier-coated liner are fitted into the casing. The flame sits near 1,400 °C while the casing wall is held inside its design limit.

Type
Annular liner
Coating
TBC
Fuel
Gas / dual
1,400°C flame temp
04Hot-gas-path fit

Turbine Module

Real hot-gas-path turbine blade on a test rig
NB-4360 · REV C · 1:25

Nozzle guide vanes and the hot-gas-path blade set go in with matched, traceable serials. These cooled aerofoils turn the hot gas into useful shaft power.

Coating
TBC / aluminide
Inlet temp
up to 1,500 °C
Blade set
Matched, traceable
1,500°C inlet temp
05Balance bay

Rotor Balancing

Real turbine rotor on the overhaul floor
NB-4415 · REV A · 1:15

The stacked rotor spools up on the balancing bed. Probes read the shake in two planes and correction weight is trimmed until residual unbalance is inside spec.

Speed
up to 12,400 rpm
Residual
≤ 0.5 g·mm
Standard
ISO 1940
0.5g·mm residual
06Test & dispatch

Full-Speed Test

Real engine test cell structure
NB-4480 · REV E · 1:30

A full-speed no-load run with every gauge logged against the build sheet. On sign-off the unit is preserved, crated and released with its as-built certificate pack.

Test
Full-speed, no-load
Records
As-built pack
Release
Certificate of conformance
12,400rpm proven
Machining cellCasing & Rotor Machining
01 / 06
01.4 / Spare parts catalogue

EVERY PART.
EXPLAINED.

An engineering cutaway of the machine we build and service — ten sub-assemblies, OEM-matched and fully traceable. Select a part to see its duty, material and availability, then build a live RFQ.

OEM-matchedFull traceabilityGlobal shipping
3D VIEW · GAS TURBINE · LIVE MODEL
Quarter cutaway · internals exposed
Loading 3D model…
ViewQuarter cut
Compressor7 rows
Turbine4 rows
Part no.DescriptionOEMCategoryCond.StockLead
P-01Air IntakeGE / SiemensAir intakeNewIn stock2–4 wks
P-02Accessory GearboxSolar / MANAccessoryRefurbOn order6–8 wks
P-03CompressorGE / Rolls-RoyceCompressorRefurbIn stock3–5 wks
P-04Stator / Guide VanesSiemensCompressorNewIn stock2–3 wks
P-05Combustion ChamberGE / SolarHot sectionOHIn stock4–6 wks
P-06Rotor & ShaftMAN / GERotorRefurbMade to order8–10 wks
P-07Turbine BladesGE / SiemensHot sectionNewIn stock2–4 wks
P-08Bearings + Lube SkidAll OEMsAuxiliaryNewIn stock1–2 wks
P-09Casing / HousingFabricatedStructureNewMade to order6–9 wks
P-10Exhaust / DiffuserGE / MANHot sectionRefurbOn order5–7 wks
Gas turbine — build & runAutoplaying film · GE Vernova
01.5 / Shop floor film

INSIDE THE
MACHINE.

Every unit is built, balanced and run before it ships. Watch how the hot section comes together — then tell us which parts you need and we'll quote them against your build sheet.

Real Siemens Energy SGT5-8000H gas turbine cutaway
Hot section
Real steam turbine rotor on the overhaul floor
Rotor overhaul
Real axial compressor blades and vanes
Blades & vanes
Real turbine factory assembly floor
Assembly floor
0parts selected
No parts added yet — add one, or we'll quote the part you are viewing (Compressor).
Request quote
Trusted & certified

OEM-GRADE.
AUDITED. PROVEN.

We supply and overhaul equipment from the world's leading turbine OEMs — backed by certified quality systems and full traceability from feedstock to dispatch.

ISO 9001Quality managementCertified processes
APIPetroleum equipmentSpec-compliant parts
ASMEPressure & powerCode-grade hardware
ATEXHazardous areasZone-rated supply
IECExExplosion safetyGlobal compliance
OEM-GradeMatched to specForm · fit · function
OEMs we service
On the floor

WHERE IT
GETS BUILT.

Real workshop, real hands. Scroll to move through the NEGBUY build-and-overhaul line — from heavy assembly to first fire.

Assembly hall01
Assembly hall

HEAVY ASSEMBLY

Rotors, casings and skids married up under overhead cranes — torque logged fastener by fastener.

48tcrane capacity
Fabrication02
Fabrication

PRECISION WELD

WPS-qualified welders, certified procedures and dye-penetrant checks on every critical seam.

100%NDT coverage
Rotor shop03
Rotor shop

BALANCE & FIT

Blade sets fitted, clearances measured, then the rotor spun for dynamic balance.

±5µmbalance tolerance
Control room04
Control room

RUN-UP CONTROL

Speed, vibration and exhaust temperature watched live through first-fire and full-load.

24/7monitoring
Overhaul bay05
Overhaul bay

HOT-SECTION REPAIR

Coating, re-blading and liner refurbishment bring worn hot-gas-path parts back to spec.

6 wkstypical turnaround
01 / 05Scroll to advance the line
01.5 / Inside the machine

WATCH A TURBINE
BREATHE + BURN.

Scroll — the rotor spools up, oil starts flowing and the core heats to full power. A live cutaway of what NEGBUY supplies and services.

STAGE 01 / INTAKE

AIR INTAKE

Giant inlet guides pull 800kg of air per second into the compressor. Rotor spools up, inlet vanes adjust angle live.

12,400RPM ROTOR
STAGE 02 / COMPRESSION + OIL

OIL PRESSURE

Lube-oil skids push ISO VG-46 oil at 8 bar through bearings. Watch the amber oil line pulse — cooling + lubrication in one loop.

8.2BAR OIL LINE
STAGE 03 / COMBUSTION

IGNITION CORE

Compressed air meets fuel. 1,400°C flame held inside the liner while the casing stays cool — the hottest controlled fire in industry.

1,400°C COMBUSTOR
STAGE 04 / POWER OUT

POWER OUTPUT

Exhaust expands through power turbine stages. Shaft torque becomes megawatts feeding the grid, ships and plants.

42.6MW OUTPUT
SCROLL TO SPOOL UP
Field work / Oil + Turbines

REAL MACHINES.
REAL SITES.

Engineer inspecting gas turbineTW — 01

Gas Turbine Overhaul

Hot-gas-path inspection, blade replacement and balancing under ISO clean-room discipline.

98.2% availability
Industrial oil and piping systemsTW — 02

Lube Oil Supply Skids

Pumps, coolers, filters and accumulators — complete oil circulation packages for turbines.

8 bar continuous
Container ship for marine propulsionTW — 03

Marine Propulsion

Propulsion turbines, gearboxes and control retrofits for vessels and offshore platforms.

40+ vessels served
Wind turbines at power plantTW — 04

Power Plant Support

Spares, commissioning and lifetime extension for generation and solar-hybrid sites.

240 MW supported
01.8 / NEGBUY Factory — assembly bay

PRODUCTION
NEVER STOPS.

One engine on the cradle, four trades around it, the hoist overhead. Drag the model to orbit the hall, or pick a station and the camera walks down the line with you.

Building the 3D floorloading models…
Drag to orbit
BAY 01 / ASSEMBLY

HANDS ON THE ENGINE

Fitters seat the rotor, torque the case bolts and spin-check the shaft by hand — every value logged against the build sheet.

4CREW ON THE BAY
BAY 02 / WELD + QC

SPARKS FLY

The welder fires in pulses up the step ladder while the QC lead scans every seam against the drawing. Lamp stays green — pass, pass, pass.

99.4%QC PASS RATE
BAY 03 / OIL + TEST

OIL + TEST

Lube-oil rigs fill, pressurise and leak-test each turbine at 8.2 bar. The amber floor line breathes with the test cycle.

8.2BAR TEST PRESSURE
BAY 04 / DISPATCH

NEGBUY OUT

The hoist lifts each finished turbine off its cradle into crates — stencilled, barcoded, sealed for the next plant on the route.

12.4KUNITS / SHIFT
Drag the bay to orbit · pick a station to move the camera
0 MWPower supportedAcross generation sites
0Units / shiftFactory line output
0%QC pass rateVision-inspected seams
0+Vessels servedMarine + offshore
03 / Work in the field

PROOF,
NOT PROMISES.

A snapshot of recent supply, overhaul and spares programmes across power, oil & gas and marine.

HOT-SECTION OVERHAUL, 4× GT01Combined cycle · 240 MW

HOT-SECTION OVERHAUL, 4× GT

Emergency supply of combustor liners and transition pieces to bring four units back online ahead of peak demand.

  • 18 daysSite turnaround
  • 240 MWCapacity restored
  • 0Unplanned trips
REFINERY GT SPARES PROGRAMME02Refinery · continuous duty

REFINERY GT SPARES PROGRAMME

Multi-year consumables and capital spares stockholding for a downstream refinery running two frame gas turbines.

  • 1,400+Line items held
  • 24 hEmergency dispatch
  • 99.2%Line availability
FLEET ENGINE OVERHAUL03Marine · offshore fleet

FLEET ENGINE OVERHAUL

Planned overhauls and genuine OEM spares for a marine propulsion fleet, delivered to three ports in tandem.

  • 11 unitsOverhauled
  • 3 portsSimultaneous
  • 12 mthWarranty
Showreel

THE WORK,
IN MOTION.

Real turbines, real plants, real crews. A look at the equipment we supply, the overhauls we run and the sites we keep producing.

  • 45,000+Part numbers
  • 40+Countries
  • 24/7Breakdown desk
01 / The NEGBUY network

WE DON'T JUST
SUPPLY EQUIPMENT.
WE MOVE INDUSTRY.

02 / Solutions

BUILT FOR
THE CRITICAL.

01 / ENERGY

Energy
Systems

Power generation, distribution and clean-energy infrastructure.

02 / TURBINES

Turbine
Solutions

Gas turbine parts, engines, maintenance and optimization.

03 / MARINE

Marine &
Offshore

Marine automation, navigation and power solutions.

04 / AUTOMATION

Industrial
Automation

Control systems, electrical engineering and process optimization.

03 / Industries

ONE NETWORK.
MANY WORLDS.

NEGBUY serves energy, turbine, oil & gas, marine, electrical, automation, EV and solar requirements.

05 / Client feedback

WHAT THE
PLANT FLOOR SAYS.

NEGBUY identified a discontinued hot-section part from a photo alone and had a matched replacement on site within a week. The unit never missed its dispatch window.

Operations ManagerCombined-cycle power plant, GCCEmergency spares

The spares programme removed a huge amount of risk from our maintenance planning. Genuine parts, correct paperwork, and dispatch we can actually rely on.

Reliability LeadDownstream refinery, IndiaStockholding

Planned overhauls across three ports, delivered on schedule with full OEM documentation. That kind of coordination is rare in marine supply.

Technical SuperintendentOffshore fleet operatorMarine overhaul
06 / Questions

BEFORE YOU
PICK UP THE PHONE.

Still unsure about something? Our engineers answer in plain language — no obligation, no pressure.

Both. We supply genuine OEM parts with full traceability, and where lead times or budgets demand it, form-fit-function equivalents built to the same specification. Every option is quoted with its documentation and warranty stated up front.

Send a part number, a nameplate photo or just the fault description. Our desk identifies the unit and returns a scoped, fixed quote — typically within 24 hours. Emergency stock dispatches from our global feedstock, often inside 48 hours.

Frame and aeroderivative gas turbines, steam turbines and generators across GE Vernova, Siemens Energy, Mitsubishi Power, Solar Turbines, Ansaldo, MAN and others — plus custom parts sourced and machined to your build sheet.

Yes. Beyond spares we run planned overhauls, hot-section repairs, balance work and commissioning support with certified crews, either at our workshop or on your site.

Parts ship with material certificates, dimensional inspection records and a standard 12-month warranty, backed by ISO 9001 quality processes and full traceability from feedstock to dispatch.

We do. We build dedicated consumable and capital-spares inventories for plants and fleets, so critical items are reserved against your name and released on call. You only pay for what you draw.

07 / Start a conversation

SEND THE
PART NUMBER.

Tell us what's down, what's worn or what's due — we'll come back with a scoped fixed quote and a real dispatch date.

  • 24 h quote turnaround
  • 48 h emergency dispatch
  • 12 mth parts warranty
contact@negbuy.com

Typical reply within one business day. No obligation.